In the heart of London, at High Holborn, a significant roof glazing replacement project unfolded, reshaping the office space to enhance its energy efficiency and functionality. This case study delves into the successful replacement of 250m² of roof patent glazing, showcasing our Heritage system, equipped with solar-controlled double-glazed units to combat solar gain and bolster thermal efficiency during a comprehensive office refurbishment.

A Complex Glazing Project

The scope of this glazing project encompassed a multi-tiered structure, characterised by its irregular shape. Additionally, two self-supporting lantern rooflights were integrated, both of which were meticulously glazed using our unique Heritage glazing system. The intricate design and structure demanded a nuanced approach to the replacement process.

Addressing Structural Challenges

The survey of the existing structure revealed significant structural unsoundness, necessitating a more intricate solution. Vinci Facilities, in collaboration with our team, embarked on a complete reconstruction of the irregular multi-tiered structure. This endeavour required complex design coordination to ensure the newly built structure seamlessly integrated with our Heritage system. The cooperative effort proved fruitful as we delivered the project punctually, adhering to the stringent programme.

Building on Success

Building on the success of our previous collaboration on the roof patent glazing at The Institute of Civil Engineers Headquarters at 1 St George Street, London, Vinci Facilities entrusted us once more to deliver this unique project. Our track record of successful delivery at 1 St George Street was a key factor in Vinci Facilities’ decision to partner with us again.

Result: Enhanced Functionality and Aesthetic

The roof glazing replacement at High Holborn attests to our commitment to enhancing energy efficiency and revitalising spaces whilst staying true to conservation. Our Heritage system, featuring solar-controlled double-glazed units, has significantly reduced solar heat gain and improved thermal efficiency, making the office space more comfortable and environmentally conscious.

This case study highlights our adeptness in handling complex structures, responding to structural challenges, and coordinating effectively with project partners. The end result is a revitalised office space that not only looks impressive but also operates efficiently, offering a conducive environment for work and innovation.

Testimonial ~ Paul Bagley, Senior Project Manager at Vinci Facilities Ltd

“I highly commend the exceptional work carried out by Standard Patent Glazing Co Ltd on the Roof Glazing Replacement at High Holborn, London. The complexity of this project, including irregular structures and lantern rooflights, was expertly managed. Addressing structural challenges through complete reconstruction was challenging but successful.

This achievement is a continuation of our prior collaboration at The Institute of Civil Engineers Building, and it exemplifies our dedication to functionality, aesthetics & conservation.”

Commercial

Heritage

Skylight

Main Contractor:

Vinci Facilities Ltd

Architect:

Vinci Facilities Ltd
High Holborn London roof glazing
Skylight, High Holborn - London
High Holborn London roof glazing